株式会社JOUJU

LANGUAGE : ENJP
MENU

HOME > NEWS > JOUJU has started operation of wind power.

2019.11.13

JOUJU has started operation of wind power.

In January 2019, JOUJU began operating two wind power plants in Ikata-cho, Nishi-Uwa-gun, Ehime Prefecture. The height of the pillar called the tower is 20m, and the length of the three wings called the blade attached to the top is 7.5m. Although it operates 24 hours a day throughout the year, its output increases from autumn to spring, especially in the winter when the wind is strong from the windy Seto Inland Sea and the Pacific Ocean.